
Verra, Gold Standard and the GHG Protocol, in every form.
Each standard sets out what must be measured, documented and retained. Theo turns these requirements into mobile forms for field data collection, and the evidence you need to provide.
Book a demoOne module per standard
A module brings together the requirements of a methodology: attributes to collect, validation rules, expected evidence and calculations.
- Available
Verra, VM0047Verified Carbon Standard. VM0047 methodology: afforestation, reforestation and revegetation, monitored by census or by sample plots.
- Available
Gold StandardGold Standard certified afforestation and reforestation projects.
- Available
GHG ProtocolCarbon removals in supply chains, reported in corporate greenhouse gas inventories.
From requirement to evidence on file
- In the methodology
The requirement
Measure the diameter at breast height of every tree in the sample, 1.30 m above the ground.
- In the mobile app
The form
DBH field in cm, validation rule against the previous visit, photo of the diameter tape.
- In the verification file
The evidence
Value, photo, author, timestamp and geolocation, linked to the original requirement.
What Theo does, what you own
Theo takes care of
- Collecting, time-stamping and geolocating field data
- Linking each evidence item to a requirement
- Keeping a version history of forms and calculations
- Preparing the verification file for the auditor
You remain responsible for
- Choosing the standard and the methodology
- Writing the project design document
- Working with the VVB
- Registering the project and requesting issuance
Frequently asked questions
Credit issuance
Theo does not validate projects or issue carbon credits. The project developer registers the project and requests the issuance of credits. Theo collects the field data, links each evidence item to a requirement and prepares the verification file for the auditor.
Methodology versions
Theo keeps a version history of forms and calculations. Each evidence item stays linked to its original requirement, and a correction preserves the previous value and the reason for the change, so the auditor sees the complete history.
Other standards
If you use another standard or methodology, book a demo and tell us about your project.
Working with the VVB
Working with the VVB remains your responsibility. Theo keeps the field registry: validated plots and their history, planted trees with their GPS coordinates, diagnostics and training, and each field entry keeps its author and date. Tables export as CSV to build the verification file. See Theo Web.
Project design document
You write the project design document and choose the standard and the methodology. Theo prepares the evidence file: time-stamped, geolocated field data, evidence items linked to requirements, and the version history of forms and calculations.
