Skip to content
Field staff holding up a plot sign

Verra, Gold Standard and the GHG Protocol, in every form.

Each standard sets out what must be measured, documented and retained. Theo turns these requirements into mobile forms for field data collection, and the evidence you need to provide.

Book a demo

One module per standard

A module brings together the requirements of a methodology: attributes to collect, validation rules, expected evidence and calculations.

  • Available

    Verra, VM0047

    Verified Carbon Standard. VM0047 methodology: afforestation, reforestation and revegetation, monitored by census or by sample plots.

  • Available

    Gold Standard

    Gold Standard certified afforestation and reforestation projects.

  • Available

    GHG Protocol

    Carbon removals in supply chains, reported in corporate greenhouse gas inventories.

From requirement to evidence on file

  1. In the methodology

    The requirement

    Measure the diameter at breast height of every tree in the sample, 1.30 m above the ground.

  2. In the mobile app

    The form

    DBH field in cm, validation rule against the previous visit, photo of the diameter tape.

  3. In the verification file

    The evidence

    Value, photo, author, timestamp and geolocation, linked to the original requirement.

What Theo does, what you own

Theo takes care of

  • Collecting, time-stamping and geolocating field data
  • Linking each evidence item to a requirement
  • Keeping a version history of forms and calculations
  • Preparing the verification file for the auditor

You remain responsible for

  • Choosing the standard and the methodology
  • Writing the project design document
  • Working with the VVB
  • Registering the project and requesting issuance

Frequently asked questions

Credit issuance

Theo does not validate projects or issue carbon credits. The project developer registers the project and requests the issuance of credits. Theo collects the field data, links each evidence item to a requirement and prepares the verification file for the auditor.

Methodology versions

Theo keeps a version history of forms and calculations. Each evidence item stays linked to its original requirement, and a correction preserves the previous value and the reason for the change, so the auditor sees the complete history.

Other standards

If you use another standard or methodology, book a demo and tell us about your project.

Working with the VVB

Working with the VVB remains your responsibility. Theo keeps the field registry: validated plots and their history, planted trees with their GPS coordinates, diagnostics and training, and each field entry keeps its author and date. Tables export as CSV to build the verification file. See Theo Web.

Project design document

You write the project design document and choose the standard and the methodology. Theo prepares the evidence file: time-stamped, geolocated field data, evidence items linked to requirements, and the version history of forms and calculations.

Let’s talk about your project

Book a demo